Text Size:   A+ A- A   •   Text Only
ODOT Flying TBanner
Design-Build
What is Design-Build
Design-Build Base Documents
Design-Build Projects
Design-Build Low Bid Base Documents
Design-Build Low Bid Projects
Additional Information
Conference Presentations
Helpful Links
What is Design-Build
Design-Build is a method of project delivery where engineering design and construction are combined into one solicitation and a firm or team of firms work together to deliver the project.  The Agency retains oversight of the Design-Build contract.  This type of contracting can be advantageous in a number of instances.  One of its main strengths is the ability to effectively implement schedule critical projects because construction activities can proceed concurrent with design activities, thus accelerating project delivery.

Design-Build Base Documents
The ODOT Design-Build Base Documents, including both the RFQ and RFP, are posted below.  

If you have any questions regarding the Design-Build Base Documents contact:
 
Jim B. Cox, Major Projects Branch Assistant Manager at (503) 986-6612 or by email at:  Jim.B.Cox@odot.state.or.us


 
BASE DOCUMENTS - VERSION 1 - FINAL - MAY 25, 2007  (Superseded by Version 2 on December 17, 2007)
 
 

Design-Build Projects

 

Bundle
Project Name                                                                       
Region
In Procurement
In Construction
Construction Complete
Close-out  Complete
NA
I-5: Coast Fork Willamette River (Southbound) Bridge
2
 
 
X
X
NA
I-84: Lower Perry Interchange (Grande Ronde River) Bridges
5
X
X
NA
I-84 Quarry Bridges
5
 
 
X
X
102
US20: Central Oregon Highway Bridges (COHB)
5
   
X
X
101
Mount Hood to Chemult (MHC)
1 & 4
   
X
X
353
I-5: Sutherlin to Roseburg Section (SRS)
3
X
X
A02
I-5 Clarks Branch to Tunnel Mill Race (CBT)
2 & 3
   
X
X
211
I-5: Wilsonville to Hayesville Interchange (WHI)
2
X
X
454
US 20: Pioneer Mountain to Eddyville Section (PME)
2
X
215
I-5: McKenzie River to Goshen Grade (MRG)
2
   
X
X
306
I-5: Weaver (I5W)
3
X
X
401
OR38:  Elk Creek to Hardscrabble Creek (EHS)
3
X
X
414
US395:  McKay Creek to Silvies Slough
5
 
X
   
508
I-5:  Elkhead Rd - OR126: Knowles Creek 
2
 
X
   
 
Up-Coming Design-Build Projects:
  • None scheduled at this time

Design-Build Low Bid Base Documents
The ODOT Design-Build Low Bid Base Documents are in development and pending posting.  If you have any questions regarding the Design-Build Low Bid Base Documents, please contact:
 
Jim B. Cox, Assistant Manager at (503) 986-6612 or email to:
 
 
Design-Build Low Bid 15 Step Delivery Process Flow Chart
 
Design Build Low Bid 15 Step Delivery Process Summary
Design-Build Low Bid Projects
N. Umpqua River, Highway 138E (Tioga Bridge) Section DB - Low Bid Pilot Project #1
 
Project Information
N. Umpqua River, Highway 138E (Tioga Bridge) Section DB - Low Bid Pilot Project #1
 
Location: Highway 138E, at MP 28.0 in Douglas County.
Design-Builder: Timber Mountain Construction Inc.
Design Firm: Western Wood Structures, Inc.
Firms Submitting Proposals: Timber Mountain Construction Inc.
                                                West Coast Contractors, Inc
 
Bid Opening Date: June 16, 2011
Award Date: July 21, 2011
Contract Amount: $619,000
Contract Completion Date: October 31, 2012 
 
The project work consists of designing, fabricating and installing a tied-timber arch pedestrian bridge over the N. Umpqua River using existing bridge piers. The project will link the Susan Creek Campground and Day Use Area to the North Umpqua Trail via the pedestrian bridge.
 
Additional Information regarding this project can be found on ODOT Procurement Office BID and Award Information Website:
http://www.oregon.gov/ODOT/CS/CONSTRUCTION/Bid_Award.shtml
 
 
For more information about this project contact:
Ted Paselk, Project Manager, @ (541) 957-3572 or email:

Additional Information
Design-Build Stakeholders Committee
 
The purpose of the Design-Build Stakeholders Committee is to support the development of a Design-Build Program that provides for efficient and effective procurement and delivery of quality Design-Build projects, meets ODOT’s needs, and allows for industry and stakeholder success.
 
Our Design-Build Stakeholders Committee page includes the committee layout, partnering agreement, meeting agendas, meeting summaries, handouts and stakeholder comments.

 
Design-Build Reference Data

Conference Presentations
Design-Build Conversation - 2008 ACEC Conference - 04/15/08 
Procurement and Management of Small Design-Build Bridge Projects - 2008 Design-Build for Transportation Conference - 04/17/08 
 

Helpful Links

Page updated: November 21, 2011